Free Construction Cost Calculator Kenya

Estimate your building budget in a minute. This calculator gives an indicative construction cost for a house, rental units, an apartment block, commercial space, an office block or a warehouse in Kenya, based on the type of building, its size, the region, the finish level and the site. Rates were last reviewed in October 2026. For the detail behind the numbers, read our guide to the cost of construction in Kenya.

Include in the estimate

Your indicative estimate

LowKES 10,806,510
Mid-rangeKES 12,469,050
HighKES 14,962,860
Cost per m²KES 103,909
Cost per ft²KES 9,653
Mid-range breakdown
Base construction costKES 9,900,000
Professional feesKES 1,188,000
Permits and approvalsKES 247,500
Contingency (10%)KES 1,133,550
TotalKES 12,469,050

These figures are indicative estimates only. Actual construction costs depend on architectural design, structural requirements, site conditions, material prices, labour rates, approvals, and current market conditions. Request a detailed quotation before starting your project.

Turn your estimate into a live project budget. Track costs, variations, labour, materials, and progress with Buildsasa.

Ready to build? Buildsasa finds qualified, vetted contractors for your project, free and with no obligation.

Request a contractor

What affects construction costs in Kenya?

  • Finish level. Tiles, sanitary ware, kitchen fittings, doors and windows can move the cost per square metre by more than half.
  • Design and structure. Multi-storey buildings need more steel and concrete, and complex roofs and large spans cost more.
  • Location. Labour, haulage and approval costs differ between Nairobi, upcountry towns and remote areas.
  • Site conditions. Sloping plots, black cotton soil, rock and poor access add earthworks, foundations and transport.
  • Material prices. Cement, steel and timber prices move with the market and the exchange rate.
  • Management. Poor planning, unrecorded changes and material wastage are among the biggest causes of budget overruns.

Indicative cost ranges by finish level

Finish levelIndicative cost per m²Suitable for
BasicKES 50,000–KES 65,000Budget homes, simple rental units, rural builds
StandardKES 65,000–KES 90,000Most family homes and mid-market apartments
PremiumKES 90,000–KES 120,000+High-end homes and premium finishes

Building cost only, before professional fees, approvals and contingency. Figures are indicative.

Frequently asked questions

How accurate is this construction cost calculator?

It gives an indicative range based on typical Kenyan building rates, your project type, size, region, finish level and site. It is a planning tool, not a quotation: a quantity surveyor's bill of quantities based on your drawings is far more precise.

What area should I enter?

Enter the total built-up area across all floors, in square metres or square feet. A two-storey house with 80 m² on each floor is 160 m².

Does the estimate include the cost of land?

No. The estimate covers building the structure and finishes, plus professional fees, permits and contingency if you tick them. Land, furniture and appliances are not included.

Why is building in Nairobi more expensive?

Labour rates, transport, approvals and demand are higher in and around Nairobi. Remote regions such as North Eastern Kenya can also cost more because materials travel further.

What do professional fees cover?

Architect, structural engineer and quantity surveyor fees. The calculator uses about 12% of the building cost; actual fees depend on the scope and the professionals you hire.

Which permits and approvals are included?

County building approval, National Construction Authority (NCA) registration and NEMA requirements where applicable, estimated at about 2.5% of the building cost.

How much contingency should I add?

Most projects add 10%. Use 5% for a simple build with complete drawings and 15% for renovations, difficult sites or projects that are still being designed.

How do I keep my project within this budget?

Get a detailed bill of quantities, agree a fixed scope with your contractor, approve changes in writing and track spending against the budget as the work progresses. Buildsasa helps contractors do exactly that.

Turn your estimate into a project you control

Buildsasa is a construction management platform for Kenyan contractors: estimating, budgets, job costing, daily site reports and client updates in one place. Explore the features or see plans.